Commercial Parking
Shopping Mall Car Park - 12 x 120 kW DC
A regional shopping centre in South East Asia needed destination charging that would keep shoppers on site longer, on a car park supply that had very little spare capacity.
12 bays
Scope
120 kW each
Configuration
36 months
Operation
Figures below are as reported for this installation. Grid capacity, site layout and operating pattern change the numbers any other project will see.

12 bays120 kW each36 months
The challenge
The available import at the car park substation was well below what 12 simultaneous 120 kW chargers would draw, and the operator would not fund a substation upgrade.
Solution
- Twelve dual-gun 120 kW all-in-one DC stations, CCS2 and GBT connectors
- Dynamic power allocation capping site import at the contracted level
- Battery-buffered units at four bays to absorb peak demand
- RFID and QR payment integrated with the mall loyalty platform
Implementation
1Site survey and load study
2Phased installation over 6 weeks
3Commissioning and OCPP back-office handover
Outcome
- 12 DC bays operational without a substation upgrade
- Average session 34 minutes, dwell time up 18%
- Site import stayed within the contracted capacity through the first summer peak
Related products
Public DC Fast Charger 120-240 kW (ZT240, Dual Gun)
View product →
All-in-One DC Charger with Battery Buffer
View product →
Connectors, Cables & Power Distribution
View product →
Related guides
Related guides
7 kW vs 11 kW vs 22 kW AC wallbox
Read guide →
Related guides
Air-cooled vs liquid-cooled DC charging
Read guide →
Planning a similar installation?
Get a Quote