BESTAR
DC Charging

Floor-Standing Dual Gun DC Charger 60-120 kW (ZT120)

A floor-standing DC charging station for commercial car parks, hotel forecourts and fleet yards. Two guns deliver 60, 80 or 120 kW from a DC 150-1000 V output on a 380 V ±15% three-phase supply, at ≥96% overall efficiency, and the IP55 enclosure handles outdoor installation without a canopy. Connector sets are CCS2+CCS2 or GBT+GBT. Ethernet or 4G links the station to the back office, sessions start by APP, RFID, VIN or local control, and payment runs through RFID, Alipay, WeChat or the APP. The cabinet works from -30 °C to 70 °C, derating above 55 °C.

Power: 60 / 80 / 120 kWOutput: DC 150-1000 VGuns: Dual gun, CCS2+CCS2 or GBT+GBT
Floor-Standing Dual Gun DC Charger 60-120 kW (ZT120)

Key features

  • 60 / 80 / 120 kW dual-gun DC charging in a floor-standing cabinet
  • DC 150-1000 V output on a 380 V ±15% three-phase supply, ≥96% efficiency
  • IP55 enclosure for outdoor installation without a canopy
  • CCS2+CCS2 or GBT+GBT connector configurations
  • Ethernet / 4G connection to the back office
  • Start by APP, RFID, VIN or local control; pay by RFID, Alipay, WeChat or APP

Configurable options

1Confirm power level
2Choose gun configuration
3Confirm payment & backend
4Quote & lead time

Technical specifications

ModelZT120
Power60 / 80 / 120 kW
Output voltageDC 150-1000 V
InputAC 380 V ±15%, 3P5W, 50 ±5 Hz
Input current≤149 / 223 / 298 / 372 / 446 A
ConnectorsCCS2+CCS2 or GBT+GBT, dual gun
Efficiency≥ 96%
CommunicationEthernet / 4G
Startup methodAPP / local / VIN / RFID
PaymentRFID, Alipay, WeChat, APP
Protection classIP55, outdoor installation
MountingFloor-standing
Operating temperature-30 °C to 70 °C (derating above 55 °C)
Humidity5% - 95% RH
MOQ1 set
Lead time30-45 days
Certification on this product line: supplied to match your target market. Test reports and declarations of conformity are confirmed per order - tell us the destination market and we match the required documents.

Where this charger fits

DC fast charging is specified by dwell time rather than by headline power. A 60 kW unit adds roughly 100 km of range in half an hour for a typical passenger EV; a 240 kW unit does the same in well under fifteen minutes, but only when the vehicle and the site supply can both support it. These units are built for locations that need to move cars through predictably: retail forecourts, highway service areas, fleet depots and public car parks.

Retail, hospitality and leisure forecourts

A charger on a supermarket, hotel or restaurant forecourt converts a stop the customer was already making into a useful top-up. Two guns on one cabinet keeps the installation cost per parking bay low, and the session length matches a typical shopping or meal visit.

Highway service areas and transport corridors

Long-distance drivers arrive with a low state of charge and leave as quickly as possible. Power per gun matters more than the number of bays here, and liquid-cooled cable variants keep full output available on hot days and during back-to-back sessions.

Fleet depots and logistics yards

Vans and light trucks return to the same yard on a fixed schedule. Charging is planned around the shift rather than the driver, so the priority is reliable scheduled sessions, clear reporting and a unit that a duty manager can restart without a technician.

Workplace and municipal car parks

Cars sit for six to nine hours, which means even a modest DC unit removes the need for a wallbox on every bay. Operators usually start with one or two units and add bays as utilisation data comes in from the back office.

How to specify

  1. Fix the gun standard before anything else. CCS2 covers Europe and most new markets, CCS1 covers North America, GB/T covers China, and CHAdeMO is only worth specifying where legacy Japanese vehicles are still in service.
  2. Size power to dwell time, not to the brochure. 30-60 kW suits workplace and fleet overnight or half-day parking; 120-240 kW suits retail and corridor sites where the customer wants to leave in twenty minutes.
  3. Check the site import before confirming output. A 240 kW cabinet needs a supply that can carry it; where the transformer is the limit, a battery-buffered unit lets a fast charger run on a supply that would otherwise be refused.
  4. Decide on back office and payment in the same conversation as the hardware. OCPP 1.6J keeps the unit portable between networks, and RFID, QR and POS options should be agreed before the cabinet is built rather than retrofitted on site.

Frequently asked questions

What is the difference between an all-in-one and a split DC charger?

An all-in-one cabinet contains the power modules, the controller and the guns in a single enclosure, so it is quicker to install and easier to relocate. A split system separates the power cabinet from the dispensers, which lets one cabinet feed several parking bays and keeps the heavy equipment away from the vehicles. Split systems are normally chosen for six or more bays or for sites where parking layout and power room are far apart.

Can we run the charger on our own management platform?

Yes. The units expose OCPP 1.6J over Ethernet or 4G, so they can be pointed at your own CSMS or at a third-party roaming hub. Local authentication by RFID, QR code, app or VIN continues to work if the connection drops, and transactions are queued for upload when the link comes back.

How is the unit protected outdoors?

Enclosures are rated IP54 with IK10 impact protection on the public-facing models, with IP55 available where washdown or heavy rain exposure is expected. Cooling, cable entry and the gun holster are the three areas that decide long-term reliability, so the specification should state the ambient temperature range and whether derating above 55 C is acceptable for your climate.

How does this differ from the higher-power ZT240?

This is the 60-120 kW floor-standing version for sites that do not need 240 kW, with IP55 for outdoor installation. The electrical architecture, communication and payment options are the same family, so a site can mix the two ratings on one back office.

Related products

DC Fast Charging Station 60-160 kW

DC Fast Charging Station 60-160 kW

View specifications →
Compact DC Charger 20-40 kW

Compact DC Charger 20-40 kW

View specifications →
All-in-One DC Charger with Battery Buffer

All-in-One DC Charger with Battery Buffer

View specifications →
Need a price for this model?
Send the destination market, quantity and required connector type — we reply with a quotation and lead time.
Request a quote